I fitted back to June 27th with 716 ap2 with kbs tour V shaft, the titleist fitter told me that because kbs tour V shaft is the special order and it takes about month or month and half to arrive.
I live in Taiwan and I know it suppose to have some transition time.
Does it really take that long to build and ship to Taiwan?
Thanks,
David